Mit-ivy ụlọ ọrụ metal Advanced Acrylic Latex Sealing Primer nwere ezigbo ike ịbanye






Ngwa
Ọ nwere ezigbo nrapado na nchara nchara na mmiri ndị nwere ụdị mmiri, yana ọmarịcha anụ ahụ na akụrụngwa mgbe agba agba dị.
5. Ihe nkiri agba nwere nchedo ọkụ dị mma na ichebe agba mgbe ihicha.
Ngwa a tụrụ aro ka ọ dị mma maka nchedo drainage nke gwongworo, akụkụ igwe, ngwa ọrụ ọkụ, wdg ebe achọrọ nchebe dị elu.
Nka na ụzụ data Agba
Mkpụrụ akọrọ (50% miscibility) 15 ℃ C <1h ; 25'C <0.5h
Mmiri siri ike (50% iru mmiri) 15'C <48h; 25 ° C <24h
Naada "kg.cm" 50
Mmiri (50 ± 5μm) 72h agba ihe nkiri anaghị afụ ụfụ, ọ naghị enyere ọdịda, ọ bụghị nchara.
Ekweghị ekwe 0.3 (abụọ pendulum) n'ibu onwunwe ule film ọkpụrụkpụ (23 ± 3jμm)
Nrapado (Hegelian) Ọkwa 1
Ọgwụgwọ Elu nke ihe mkpuchi ahụ kwesịrị ịbụ nke enweghị mmiri, mmanụ, carbon acid na ash.






Nkọwa ọsọ ọsọ
Nchara nwere akpụkpọ anụ:
Ede ya ka iwepu ubu gbajiri agbaji.
Nchara na-enweghị akpụkpọ oxide: sandblasted (shotblasted) na Sa2.5 ma ọ bụ ikuku na-arụ ọrụ, eletriki igwe eletrik na St3.
Eldgbado ọkụ, ịcha ọkụ ma ọ bụ mgbazigharị ọkụ nke ebe a na-agba ọkụ: egweri na St3 larịị.
Ihe eji eme ihe na ihe nkiri agba ochie: wepu ihe ochie agba agba na nchara, na ájá na St3 na ngwaọrụ ikuku ma ọ bụ eletrik.
Enwere ike iji ngwungwu ihe osise na H902 primer na-agbanye mmiri, ma ọ bụ jiri naanị ya dị ka akwa mkpuchi isi, ma ọ bụ jiri ụdị ngwaahịa ndị ọzọ (mkpa ka adaba maka nkwenye).
Construction data Table dry (50% temperature) 15'C<th;25℃C<05h Actual dry (50% humidity) 15℃C<24h;25℃<12h Density about 1.1-1.20g/cm' Theoretical coating rate 0.15-0.2kg/m' (dry film 40-50) μm)
It is recommended to apply 2 coatings, which can be applied in the way of warm touching temperature to ensure that the dry film is 40-50μm.
To be sanded and finished with sandpaper.
Construction method Air or robot spraying is possible. Mix the paint before use, adjust the viscosity according to the construction method.
Add 5-15% of water. Add water and stir evenly, then leave the surface to work without bubbles.


Construction environment 1. The brain playground should have good ventilation and dust removal facilities to ensure the quality of construction.
2. The construction should be carried out under the condition that the mixing degree is above 5℃C and the relative humidity of the environment should be <70%.
3. The substrate temperature shall be not less than 5' and shall be more than 3'C above the air dew point temperature.
washout
Vehicle Type | 100% Acrylic Latex | |
COMPOSITION (nominal) | Pigment : Lightfast Non-Lead Pigments & Mineral Extenders.
Blinder : Acrylic Emulsion. Solvent : Water. |
|
Volume Solids | 31.8% | |
Coverage per Gallon at Recommended Film Thickness | 400 –450 Sq. Ft. (37-42 m2) | |
Recommended Film Thickness
(Depending on surface texture and porosity. Be sure to estimate the right amount of paint for the job. This will ensure color uniformity and minimize the disposal of excess paint) |
Dry 1.2 mils
Wet 3.8 mils |
|
Dry Time @ 77° F (25° C) @ 50% RH
(High humidity and cool temperatures will result in longer dry, recoat and service times.) |
To Touch 1 Hour
To Recoat 2 to 4 Hours |
|
Dries By | Evaporation, Coalescence | |
Viscosity | 99 ± 2 KU | |
Gloss / Sheen | Flat (5-10 @ 85°) |
Shipping time by Sea (Just for reference) | ||||||||
North America |
11~30 days | North Africa | 20~40 days | Europe | 22~45 days | South-east Asia | 7~10 days | |
South America | 25~35 days | WestAfrica | 30~60 days | MiddleEast | 15~30 days | East Asia | 2~3 days | |
Middle America | 20~35 days | EestAfrica | 23~30 days | Ocenia | 15~20 days | South Asia | 10~25 days |



FAQ
1.About Sample
We provide free sample for testing.
2.OEM,ODM service available.
3.According to customer's request, packed with pallet or without pallet.
Tile adhesive(20kg/bag)packing with pallet specification:
64 bags/pallet = 1.28 MT/pallet
72 bags/pallet = 1.44 MT/pallet
One full 20ft container max loading 27.6MT.
With pallets can load 1360 bags, without pallet can load 1380 bags.







